EG Planner is the world’s first AI-powered, web-based, drag-and-drop planning platform for the garment industry. Feed it your execution history and Auto Pilot lays a balanced plan across every line.

Book a demo
150+factories
+5%profitability
~10daysto go live

Trusted by garment groups across Bangladesh, Vietnam and South Korea

Run your business at the speed of thought. Auto Pilot lays a full, balanced plan across every line, fifty or five hundred, in one pass.

Five steps to a committed plan.

Sales orders in, a successful plan out. You review every result and commit only what you want.

Sales orders

The live order book flows in from your merchandising data.

Load lists

Group what is ready to plan, by buyer, style or ship week.

Select orders

Pick the scope. One order, one buyer or the whole group.

Auto Pilot

The ML engine places every order on the best line, respecting capacity and ship dates.

Successful plan

Review, adjust with drag and drop, then commit.

Every step from order to shipment, on one board.

Master planning, capacity, time and action, and built-in BI, for single or multiple factories across multiple countries.

Production managementLine planningSales ordersUser managementTime & actionSupply chain syncMaster schedulingBuilt-in BI

Visual planning

Drag and drop the whole group. Up to 24 months of plan in one window, with multiple planners across factories working at once. Click any strip for buyer, quantities, ship date and live progress.

Smart actions

Prioritize by ship date, split late quantity, move multiple strips, or hand it to AI with Plan Based on AI (Best Line), right from the strip.

Capacity and load balancing

Line-, floor- and factory-wise load at a glance: OK, high or over, with daily capacity against planned man-hours and a live order pool.

Critical path and T&A

Track every order from confirmation to shipment, including sewing and finishing accessories and sample approval, with on-time and delayed flagged early.

Business intelligence

A rolling multi-month summary of working days, manpower, load %, planned against budget minutes, plan efficiency and FOB value, so leadership sees where the group is committed and where capacity is free.

Set the ceiling before you plan.

Route capacity in. Live utilization out. Overbooking shows up as a colour, not a missed shipment three months later.

Route capacity entry

Set capacity per business unit and process, month by month, for this year and next. Roll a whole year forward in one step, and totals reconcile as you type.

Utilization heatmap

A business unit by process matrix coloured from green to red, so bottlenecks surface before they cost you a delivery.

Daily capacity calendar

Drill from the year into a single month: planned against capacity per day, with holidays and weekends flagged and peak-load days called out.

Group utilization118%
Tap a cell to see its load.
IdleOverloaded

Illustrative data.

One route in. A requirement plan for every process out.

Define your supply-chain route once. EG Planner derives a date-phased requirement for every process from the live production plan, in quantities, machines and capacity.

    Cutting requirement

    Required, produced and balance per sub-order, with lag or advance in days.

    Machine requirement

    Total, running and idle against requirement. Shortfalls in red.

    Illustrative data. Every figure in the live product is derived from your route and plan.

    Your whole plan, simulated in the blink of an eye.

    One click walks every sewing line through its real working-hour calendar, shows which orders ship on time, and proposes fixes for the ones that will not. Nothing changes without your click.

    17Delayed
    81Advanced
    3Material risk
    4On track
    105Total planned

    Choose your levers

    Everything starts off. Switch on only what you would accept on your floor.

    Every proposal explains itself

    You stay in charge. Accept what you agree with.

    Applied in one transaction. Every change is logged with who and when.

    Re-sequence

    Swap the queue on the same line so the urgent strip sews first. The other still ships fine.

    Move

    Shift the late strip to a line with room. Same ship date, earlier finish, nothing else late.

    +2h

    Add hours

    Raise working hours only on the late order’s own days. The rest of the line keeps normal hours.

    Split

    Keep exactly what ships on time. The remainder becomes a new strip on the best other line.

    Which line sews this best? Your history already knows.

    Train the model on your own sewn output. You pick the window, 90 to 360 days.

    “Best lines for Ladies Trouser at SM 12?”
    RankLineCategory · SM bandEfficiencyProd / h
    #1Line FLadies Trouser · 10.0–10.2571.3%366
    #2Line DLadies Trouser · 10.0–10.2557.6%296
    #3Line KLadies Trouser · 10.0–10.2550.4%264

    Illustrative data.

    Build your own dashboards, reports and integrations.

    EG Planner is not a fixed set of screens. Drag, drop and connect, so the platform fits how your group already works, including the legacy ERP you cannot rip out.

    Dashboard Builder

    Point it at your data and it surfaces the fields, measures and relationships. Drag KPIs, charts and tables onto a canvas and your dashboard is live, with no SQL and no waiting on IT.

    Auto-discoveryDrag and dropLive

    Report Builder

    Compose clean reports from any planning or production data: choose fields, group, pivot by month, add subtotals and grand totals, then export to Excel or print, all without a developer.

    PivotSubtotalsExcel and print

    API Builder

    Build inbound and outbound APIs to move data to and from any existing ERP. Keep your legacy system of record and let EG Planner plan on top of it, two-way and mapped to your schema.

    Two-waySchema mapAny ERP

    400 lines, one ERP, zero rip-and-replace.

    For New Asia Group, EG Planner was integrated with their existing ERP and brought 400 sewing lines onto one planning platform. Their system of record stayed in place while planning, capacity and requirement ran on top of it through two-way APIs.

    Existing ERP

    System of record, unchanged.

    EG Planner API engine

    • Visual planning
    • Capacity
    • Requirement
    • BI and T&A

    400+ sewing lines

    On a single planning platform.

    400+sewing lines on one platform
    2-waylive ERP integration, mapped to schema
    ~3moto fine-tune data and prove integrity

    Plan tighter. Ship on time. Use what you already have.

    Figures below come from client feedback and from how EG Planner is implemented.

    ~20daysto repay your return on investment
    ~10daysto go live as a standalone system
    2daysto learn the whole planning process
    10minto plan 50 sewing lines from scratch

    +5% profitability

    More output from the same lines, machines and people, with no new capex.

    +10% efficiency

    Input gaps close, overtime drops and the supply chain moves in sync.

    On-time shipments

    Delay risk surfaces at the milestone, while there is still time to fix it.

    Multi-factory, one view

    Business units and factories across countries on a single platform.

    Teams aligned

    Merchandising, planning, production and supply chain on one truth.

    Low-risk rollout

    Standalone go-live in about 10 days. Full ERP integration is a planned project of around 3 months, supported by our own engineers.

    The expertise you need. The flexibility you deserve.

    Built by a software company that understands manufacturing.

    Efficient ERP standards

    Designed and used by Efficient ERP. Proven conventions, not a generic template.

    Easy implementation

    Our team adapts EG Planner to your current processes, not the other way around.

    Fully dynamic

    A full range of features that adjust to your workflow and userbase.

    Scalable

    Flexibility designed to change and grow with your business and staff.

    Global functionality

    Single or multiple factories, across multiple countries and time zones.

    In-house support

    Implementation and support are done only by Efficient ERP engineers, never outsourced.

    Plan with intelligence, on your own floor.

    Call, mail or message us to arrange a working session on your order book and execution history.

    Questions, answered.

    A standalone go-live takes about 10 days, and most teams learn the system in about 2 days. Full two-way integration with an existing ERP is a planned project, typically around 3 months to map, fine-tune and prove data integrity.

    No. With the API Builder you keep your legacy system of record and let EG Planner plan on top of it. Data moves both ways, mapped to your schema.

    Yes. Business units and factories across countries and time zones sit on one platform. Multiple planners can work on the same board at the same time, with up to 24 months of plan in one window.

    Never. Every proposal is explained in plain words and nothing touches the plan without your click. Accepted changes are applied in one transaction and logged with who and when.

    Efficient ERP engineers, exclusively. Implementation and support are never outsourced, and the team adapts EG Planner to your current processes.

    Book a demo.

    Call, mail or message us to book a presentation.

    Call or WhatsApp(+880) 1716-085644
    Head officeD3 (West), B#01, Angel City, Savar, Dhaka
    Branch officeRID Holdings Ltd, 932 (3rd floor), Shahid Mirza Lane, Mehedibag, Chattogram