Visual planning
Drag and drop the whole group. Up to 24 months of plan in one window, with multiple planners across factories working at once. Click any strip for buyer, quantities, ship date and live progress.
EG Planner is the world’s first AI-powered, web-based, drag-and-drop planning platform for the garment industry. Feed it your execution history and Auto Pilot lays a balanced plan across every line.
Trusted by garment groups across Bangladesh, Vietnam and South Korea
Run your business at the speed of thought. Auto Pilot lays a full, balanced plan across every line, fifty or five hundred, in one pass.
Give it your history. Get a full plan back instantly.
Past output, efficiency and SMV by line, style and buyer.
Patterns of capacity, learning curve and best-line fit per product.
Balanced placement across every line. Review, tweak, commit.
Sales orders in, a successful plan out. You review every result and commit only what you want.
The live order book flows in from your merchandising data.
Group what is ready to plan, by buyer, style or ship week.
Pick the scope. One order, one buyer or the whole group.
The ML engine places every order on the best line, respecting capacity and ship dates.
Review, adjust with drag and drop, then commit.
Master planning, capacity, time and action, and built-in BI, for single or multiple factories across multiple countries.
Drag and drop the whole group. Up to 24 months of plan in one window, with multiple planners across factories working at once. Click any strip for buyer, quantities, ship date and live progress.
Prioritize by ship date, split late quantity, move multiple strips, or hand it to AI with Plan Based on AI (Best Line), right from the strip.
Line-, floor- and factory-wise load at a glance: OK, high or over, with daily capacity against planned man-hours and a live order pool.
Track every order from confirmation to shipment, including sewing and finishing accessories and sample approval, with on-time and delayed flagged early.
A rolling multi-month summary of working days, manpower, load %, planned against budget minutes, plan efficiency and FOB value, so leadership sees where the group is committed and where capacity is free.
Route capacity in. Live utilization out. Overbooking shows up as a colour, not a missed shipment three months later.
Set capacity per business unit and process, month by month, for this year and next. Roll a whole year forward in one step, and totals reconcile as you type.
A business unit by process matrix coloured from green to red, so bottlenecks surface before they cost you a delivery.
Drill from the year into a single month: planned against capacity per day, with holidays and weekends flagged and peak-load days called out.
Illustrative data.
Define your supply-chain route once. EG Planner derives a date-phased requirement for every process from the live production plan, in quantities, machines and capacity.
Required, produced and balance per sub-order, with lag or advance in days.
Total, running and idle against requirement. Shortfalls in red.
Illustrative data. Every figure in the live product is derived from your route and plan.
One click walks every sewing line through its real working-hour calendar, shows which orders ship on time, and proposes fixes for the ones that will not. Nothing changes without your click.
Everything starts off. Switch on only what you would accept on your floor.
You stay in charge. Accept what you agree with.
Applied in one transaction. Every change is logged with who and when.
Swap the queue on the same line so the urgent strip sews first. The other still ships fine.
Shift the late strip to a line with room. Same ship date, earlier finish, nothing else late.
Raise working hours only on the late order’s own days. The rest of the line keeps normal hours.
Keep exactly what ships on time. The remainder becomes a new strip on the best other line.
Train the model on your own sewn output. You pick the window, 90 to 360 days.
Illustrative data.
EG Planner is not a fixed set of screens. Drag, drop and connect, so the platform fits how your group already works, including the legacy ERP you cannot rip out.
Point it at your data and it surfaces the fields, measures and relationships. Drag KPIs, charts and tables onto a canvas and your dashboard is live, with no SQL and no waiting on IT.
Compose clean reports from any planning or production data: choose fields, group, pivot by month, add subtotals and grand totals, then export to Excel or print, all without a developer.
Build inbound and outbound APIs to move data to and from any existing ERP. Keep your legacy system of record and let EG Planner plan on top of it, two-way and mapped to your schema.
For New Asia Group, EG Planner was integrated with their existing ERP and brought 400 sewing lines onto one planning platform. Their system of record stayed in place while planning, capacity and requirement ran on top of it through two-way APIs.
System of record, unchanged.
On a single planning platform.
Figures below come from client feedback and from how EG Planner is implemented.
More output from the same lines, machines and people, with no new capex.
Input gaps close, overtime drops and the supply chain moves in sync.
Delay risk surfaces at the milestone, while there is still time to fix it.
Business units and factories across countries on a single platform.
Merchandising, planning, production and supply chain on one truth.
Standalone go-live in about 10 days. Full ERP integration is a planned project of around 3 months, supported by our own engineers.
Built by a software company that understands manufacturing.
Designed and used by Efficient ERP. Proven conventions, not a generic template.
Our team adapts EG Planner to your current processes, not the other way around.
A full range of features that adjust to your workflow and userbase.
Flexibility designed to change and grow with your business and staff.
Single or multiple factories, across multiple countries and time zones.
Implementation and support are done only by Efficient ERP engineers, never outsourced.
Call, mail or message us to arrange a working session on your order book and execution history.
A standalone go-live takes about 10 days, and most teams learn the system in about 2 days. Full two-way integration with an existing ERP is a planned project, typically around 3 months to map, fine-tune and prove data integrity.
No. With the API Builder you keep your legacy system of record and let EG Planner plan on top of it. Data moves both ways, mapped to your schema.
Yes. Business units and factories across countries and time zones sit on one platform. Multiple planners can work on the same board at the same time, with up to 24 months of plan in one window.
Never. Every proposal is explained in plain words and nothing touches the plan without your click. Accepted changes are applied in one transaction and logged with who and when.
Efficient ERP engineers, exclusively. Implementation and support are never outsourced, and the team adapts EG Planner to your current processes.
Call, mail or message us to book a presentation.